Context

Across the trust-fleet (#8390) and auto-agent (#8431, #8439) feature builds, every Critical finding caught in fresh-eyes review was a missed load-bearing convention. Each feature took 3–5 review iterations before converging to "no Critical findings on the next pass." Without an explicit policy, convergence is a heroic ad-hoc effort that depends on the engineer remembering to dispatch reviewers; with one, it's the standard workflow.

We need to codify the "iterate fresh-eyes review until convergence" pattern as the standard for substantial features, so that the engineer's first instinct after implementation passes its per-task reviews is to start fresh-eyes iteration rather than to merge.

Decision

For substantial features (new caretaker loop, new runner, spec → multi-task implementation), after the implementation passes its per-task reviews, run fresh-eyes review iterations until convergence.

  • Each iteration uses superpowers:requesting-code-review (which dispatches the code-reviewer agent) (or equivalent reviewer with no conversation context) on the cumulative diff against main.
  • The reviewer reads the spec + the diff + the live codebase and reports Critical / Important / Minor findings.
  • After fixes, the next iteration repeats.
  • Convergence = next pass finds nothing material (Critical = 0, Important ≤ 1, all explained as deliberate).

Plan for 3 iterations before merge. Empirical convergence point on recent features:

  • Trust-fleet (#8390): 5 passes
  • Auto-Agent spec (#8431): 3 passes
  • Auto-Agent wiring (#8439): 3 passes

Rules

  1. Fresh-eyes means no conversation context. The reviewer reads the diff + the live codebase and reports findings without seeing the design rationale that produced the diff. This catches assumptions the engineer has grown blind to.
  2. Don't merge before convergence. A Critical finding on iteration N is a merge-blocker until iteration N+1 confirms the fix.
  3. Iteration counts decline. Each pass should find fewer issues. If iteration N+1 finds MORE issues than iteration N, something is wrong with the fixes — pause and re-spec.
  4. Per-task reviews continue during implementation. This ADR is about the END phase (after implementation looks done); per-task reviews remain the standard during the build (per superpowers:subagent-driven-development).

Consequences

Positive: - Critical bugs caught at PR time, not in production. - Reviews surface architectural drift while still cheap to fix. - "Substantial features take 3 review passes" becomes a planning expectation, not a surprise. - Convergence is a clear merge gate: don't merge until reviews are clean.

Negative: - Substantial features take longer to merge (~30–60 min of reviewer time per pass). - Reviewers must read live code (not just the diff) — but code-reviewer agent already does this.

Risks: - Reviewer fatigue / noise from repeated passes. Mitigation: skip iterations once convergence reached; Minor-only findings don't re-trigger.

Alternatives Considered

  • Single review pass. Rejected — empirically misses bugs.
  • Reviewer in CI (mandatory). Rejected — too much friction; reviewer needs codebase access and runs ~5 minutes per pass.
  • Pre-merge checklist. Rejected — doesn't catch what reviewers do (cross-cutting drift, contract holes).

When to supersede this ADR

  • If a superpowers:production-readiness-review skill is built that automates the iteration loop, this ADR's "manually iterate" guidance becomes a legacy fallback. Update accordingly.
  • If empirical convergence point shifts (e.g., features routinely converge in 1 pass), reduce the planning expectation.

Source-file citations

  • docs/wiki/dark-factory.md §3 — the convergence loop documentation.
  • docs/adr/0050-auto-agent-hitl-preflight.md — the recent feature whose review iterations validated this ADR.
  • superpowers:requesting-code-review (which dispatches the code-reviewer agent) (Claude Code skill) — the reviewer this ADR refers to.
  • superpowers:subagent-driven-development (Claude Code skill) — the per-task review workflow during implementation.